Welding Procedure Qualification — Heavy Wall Pressure Vessel
Alright team, we're qualifying a new WPS for the reactor shell welds — SA-516 Gr.70 carbon steel, 85 mm thick. The joints are double-V groove, and we're using SAW for the fill passes. This PQR has to pass ASME Section IX and the client's supplementary requirements.
好了团队,我们在评定反应器壳体焊缝的新WPS——SA-516 Gr.70碳钢、 厚度85 mm。接头是双V坡口,填充焊道用埋弧焊。这个PQR必须通过ASME 第九卷和业主的补充要求。
Test coupon is ready — two plates of SA-516 Gr.70, 85 mm thick, 300 mm × 600 mm, double-V groove with 60° included angle, 4 mm root face, and 2 mm root gap. Preheated to 120°C as per the preliminary WPS.
试样已备好——两块SA-516 Gr.70钢板、85 mm厚、300 mm×600 mm, 双V坡口、包角60°、钝边4 mm、根部间隙2 mm。按初步WPS预热至120°C。
I've verified the preheat with a contact thermometer — 120°C uniform across the entire joint area, 150 mm beyond the groove edge per code. Hassan, what consumables?
我用接触式温度计验证了预热——整个接头区域和坡口边缘以外150 mm 都均匀120°C,符合规范。Hassan,什么焊材?
Root pass is SMAW with E7018, 4 mm electrode, at 160 amps. Fill passes are SAW — EM12K wire, 4 mm diameter, with neutral bonded flux F7A6-EM12K. Welding current for SAW is 650 amps at 32 volts, travel speed 450 mm/min. Heat input calculates to 2.8 kJ/mm.
根部焊道SMAW、E7018、4 mm焊条、160安培。填充焊道埋弧焊—— EM12K焊丝、4 mm直径、配套中性烧结焊剂F7A6-EM12K。埋弧焊电流 650安培、电压32伏、焊接速度450 mm/min。热输入计算为2.8 kJ/mm。
2.8 kJ/mm is good — below 3.0. Above that, we'd risk grain coarsening in the HAZ. Hassan, check interpass temperature after every pass — must stay below 250°C. Let it cool if needed. Park Min-Jun, why is interpass control critical for thick-section carbon steel?
2.8 kJ/mm可以——低于3.0。超过的话,HAZ有晶粒粗化风险。Hassan, 每焊一道检查层间温度——必须保持在250°C以下。需要时冷却。Park Min-Jun, 为什么厚截面碳钢的层间控制这么关键?
Two reasons. First, high interpass temperature reduces the cooling rate, which leads to larger grain size in the HAZ — that reduces toughness. Second, if interpass gets too high, the weld metal can lose its mechanical properties — the yield strength can drop below the minimum. For SA-516 Gr.70, we need to stay within 120-250°C.
两个原因。第一,高层间温度降低冷却速率,导致HAZ晶粒粗大—— 韧性下降。第二,层间温度过高时,焊缝金属可能丧失机械性能——屈服 强度可能降至最低要求以下。对SA-516 Gr.70,我们要保持在120-250°C 范围内。
First root pass is in — I'm measuring interpass at 148°C. Go ahead with the first SAW pass, Hassan.
第一道根部焊道焊好了——层间温度148°C。Hassan,开始第一道埋弧焊。
Running SAW pass 1... pass complete. Slag removal looks clean — no surface porosity.
埋弧焊第1道进行中……完成。除渣干净——没有表面气孔。
After the last fill pass, we'll do a dehydrogenation treatment — hold at 250°C for 4 hours before the PWHT. This prevents hydrogen-induced cold cracking in thick sections. Then PWHT at 620°C ± 15°C for 2 hours per inch of thickness, so 85 mm is about 3.3 inches — that's 6.6 hours, minimum.
最后一道填充焊道完成后,做消氢处理——250°C保温4小时再进行 PWHT。这能防止厚截面的氢致冷裂纹。然后PWHT温度620°C±15°C、每 英寸厚度2小时,85 mm约3.3英寸——至少6.6小时。
(after full welding and PWHT)
(完整焊接和PWHT后)
Alright, NDE is done. RT shows no cracks, no lack of fusion, no slag inclusions exceeding the acceptance criteria of ASME Section VIII. UT confirms full penetration throughout. I'm releasing the test coupon for mechanical testing.
好,NDE完成。RT显示无裂纹、无未熔合、无超出ASME第VIII卷验收 标准的夹渣。UT确认全熔透。我把试验样发放给力学试验。
(three days later, reviewing test report) Mechanical test results are in. Two tensile specimens — both broke in the base metal, not the weld. That's what we want — weld is stronger than the base metal. Four side bends — no cracks, no openings exceeding 3 mm. Charpy impact at -29°C: average 78 Joules in the weld metal, 92 Joules in the HAZ. Both well above the 27 J minimum. This PQR passes.
(三天后,在看试验报告)力学试验结果出来了。两个拉伸试件—— 都断在母材上、没断在焊缝。这正合我们意——焊缝比母材强。四个侧弯—— 无裂纹、无超过3 mm的开口。夏比冲击-29°C:焊缝金属平均78焦耳、 HAZ 92焦耳。都远高于27焦耳最低要求。这个PQR通过了。
Excellent. Maria, you'll take these PQR results and write the WPS — reference PQR number, list the essential variables: base metal, welding process, filler metal, preheat, PWHT, electrical characteristics. Any change to an essential variable requires a new PQR. Non-essential variables can be revised on the WPS without requalification.
太好了。Maria,你拿这个PQR结果编写WPS——引用PQR编号、列出基本 变量:母材、焊接方法、填充金属、预热、PWHT、电气特性。基本变量 任何变更都要做新PQR。非基本变量可以在WPS上修改不用重新评定。
On it. This WPS will cover all reactor shell longitudinal and circumferential seams. We'll qualify the welders to this WPS using the WPQ test — a test coupon in the 3G position, bend and visual test only. Per ASME, if they pass 3G, they're qualified for all positions except 6G pipe.
交给我。这个WPS将涵盖所有反应器壳体纵缝和环缝。我们用WPQ考试 按这个WPS考核焊工——3G位置试样、只做弯曲和外观试验。按ASME规范, 通过3G考试的焊工获得除6G管材外的所有位置资质。
Weld Rejection & Repair — High-Pressure Steam Line
Oscar, I've got bad news. Weld joint SP-127 on the 12-inch high-pressure steam line — RT shows a defect. I'll pull up the radiograph.
Oscar,坏消息。12英寸高压蒸汽管线SP-127号焊缝——RT显示有缺陷。 我调出射线片。
Let's see it. (studying the film on the viewer) There — a linear indication running along the center of the weld, about 40 mm long. That looks like incomplete penetration. The root pass didn't fuse properly. Lin Wei, what do you see?
我看看。(在观片灯上研究胶片)那儿——焊缝中心沿长度方向的线性 显示,约40 mm长。看起来像是未焊透。根部焊道没熔好。林伟,你看到什么?
Agreed — it's lack of penetration. And look here, there's also a small cluster of porosity — three gas pores, each about 1.5 mm. Combined with the LOP, this weld is rejectable per ASME B31.3 — the client specification says no linear indications and porosity maximum is 2 mm individual.
同意——是未焊透。再看这,还有一小簇气孔——三个气孔,每个约1.5 mm。 加上未焊透,按ASME B31.3这个焊缝不合格——业主要求无线型显示、 气孔单孔最大2 mm。
Diego, this is your weld. Any idea what went wrong?
Diego,这是你的焊缝。有没有头绪哪里出错了?
(looking embarrassed) I think the root gap was tight — maybe 1.5 mm instead of the specified 2.5 mm. The fitter rushed the fit-up. And I was welding the root pass with GTAW at 90 amps — WPS says 100-130 amps. I should have stopped and reported the poor fit-up, but I thought I could compensate with the higher heat. Clearly I couldn't.
(有些尴尬)我觉得根部间隙太小了——可能只有1.5 mm而不是规格 要求的2.5 mm。管工对口太急了。而且我GTAW根部焊道只用了90安培—— WPS说的是100-130安培。我应该停下来报告对口不好,但我以为能用高 热量弥补。显然没做到。
Diego, I appreciate your honesty. But you know the rule: never compensate for a poor fit-up with welding technique. If the joint prep isn't right, you stop, you call me, we fix the joint. A rejected weld costs us a day of schedule and NDE rework. A weld that fails in service... that could kill someone.
Diego,我感谢你的坦诚。但你知道规矩:永远不要用焊接技术来弥补 差劲的坡口。如果接头准备不对,停下来、叫我、我们修接头。一道不合格 焊缝让我们损失一天工期和NDE返工。可如果是服役中失效的焊缝…… 那是会死人的。
Alright, let's focus on the repair. Per ASME B31.3, we can repair this weld once. We need to gouge out the defective area — carbon arc gouging, then grind to clean metal. The repair cavity has to be checked with PT to confirm all defects are removed before re-welding.
好,聚焦返修。按ASME B31.3,我们可以返修一次。需要把缺陷区域 挖掉——碳弧气刨、然后打磨至清洁金属。返修槽必须用PT检查确认所有 缺陷都已清除,然后再焊接。
Diego, you'll do the repair yourself — it's your weld, you fix it. But this time, I'm going to watch the root pass. And Lin Wei will verify the joint prep before you strike an arc. Sergey, can you mark the defect location on the pipe so we know exactly where to gouge?
Diego,你自己做返修——你的焊缝、你来修。但这次,我要看你焊 根部焊道。林伟在你起弧之前验证接头准备。Sergey,能在管子上标记 缺陷位置吗?我们好精确知道在哪气刨。
Already marked with a paint pen — 40 mm section between these two lines. Gouge through the full weld thickness in this area. I'll do a guide shot with RT after gouging to make sure all the defective metal is gone.
已经用油漆笔标记了——这两条线之间40 mm段。气刨穿透这区域全部 焊缝厚度。气刨后我用RT做引导拍片确保所有缺陷金属都清了。
(after gouging, grinding, and PT check)
(气刨、打磨、PT检查后)
PT shows no indications. The repair cavity is clean. Joint prep is now correct — root gap is 2.5 mm, verified with a gap gauge. Diego, this time, GTAW root at 115 amps, SMAW for the fill and cap. And I want to see the root pass before you continue. Understood?
PT无显示。返修槽干净。接头准备正确——根部间隙2.5 mm、用间隙规 验证过。Diego,这次GTAW根部115安培、SMAW填充和盖面。我要看过 根部焊道你再继续。明白?
Understood. Thank you for giving me the chance to fix it.
明白。谢谢你给我机会修好它。
(after repair welding and re-RT)
(返修焊接和重RT后)
Re-RT is clear. No linear indications, no porosity. Weld SP-127 repair is accepted. Oscar, here's the RT report and the repair record for your files.
重RT合格。无线性显示、无气孔。SP-127焊缝返修验收。Oscar,这 是RT报告和返修记录,存档用。
Good. Diego, this goes in your training record — not as a punishment, but as a learning point. Every welder makes mistakes. The best welders only make each mistake once. Let's make sure the rest of the crew learns from this too. I'll cover the fit-up quality expectations in tomorrow's toolbox talk.
好。Diego,这个记入你的培训档案——不是惩罚、是学习点。每个焊工 都会犯错。最好的焊工同样的错只犯一次。我们让其他班组也从中学到教训。 明天的工具箱早会我讲对口质量要求。